The word “repair” for many immediately causes negative emotions. This feeling is due to the fact that this is a very time consuming, lengthy and costly process. Especially if the work is done independently. This article describes in detail how to start repairs in an apartment, depending on its type, what materials to choose and in what sequence to carry out the work, so that the repair runs without problems, and the result surpasses all expectations.

How to start repairs in the apartment: the main strategy for the implementation of works

All about apartment renovation: types and finishes

The stages of apartment renovation and the cost of work depends on the condition of the premises, the type of repair and the size of the area covered, that is, it can be the whole apartment or its individual premises. There is a capital, cosmetic and renovation. Each of them has its own clear sequence of actions, the correct result of which depends on the final result and the duration of the operation period.

Apartment renovation can be done qualitatively with your own hands, having previously studied all the nuances of work and having prepared the necessary materials

Apartment renovation can be done qualitatively with your own hands, having previously studied all the nuances of work and having prepared the necessary materials

Overhaul is considered the most ambitious and time consuming, which will require not only a lot of effort, but also significant financial costs. It involves a complete reconstruction of the apartment with possible redevelopment, replacement of windows, doors, utilities, ceiling, wall and floor covering. Usually, this is how an apartment renovation starts from scratch.

Refurbishment of a house or apartment involves the replacement of decorative trim elements of the room in one or more rooms. It is possible that when removing the old coating will require a small adjustment of the surface of the walls, ceiling, floor and corners. However, the execution of works does not take too much time and does not require significant financial investments, which are directly dependent on the selected finishing material.

How to start repairs in the room when performing cosmetic finishing? An important process in this case may be the implementation of a rough finish, which will increase the total cost of work, however, will allow to obtain the expected aesthetic effect of the selected facing materials.

Redecoration does not require significant financial investments and can be carried out in a short period of time.

Redecoration does not require significant financial investments and can be carried out in a short period of time.

Fulfillment of the European-style repair involves the use of the original design approach in the design of the premises with the use of expensive materials of foreign production, unique technologies and bold style decisions. Such an exclusive and beautiful repair in an apartment can be allowed only by wealthy people who intend to spend a substantial sum of money on the realization of their desires.

How to start overhaul in the apartment

This type of repair is usually performed in new buildings. However, for residential apartments it is not uncommon, when the owners decide to drastically change their homes. It is important to follow a specific order of repair in the apartment, which consists of the following steps:

  • redevelopment of the apartment with the possible dismantling of old or construction of new partitions, reduction or expansion of doorways;
  • laying or complete replacement of communications engineering;
  • full or partial replacement of sanitary devices;
  • electrical work associated with the implementation of the new wiring or changing the location of the old;
  • full or partial replacement of windows and doors;
  • plastering work that implies high-quality execution of the apartment’s rough finish;
  • installation of built-in furniture, if provided by the project;
  • decorative finishing elements of the room.
An important stage of preparation in the repair of a rough apartment is the design study and convenient placement of all communications.

An important stage of preparation in the repair of a rough apartment is the design study and convenient placement of all communications.

Overhaul is a lengthy process that cannot be completed in one to two weeks. Therefore, all rooms should be freed from furniture and other things that may be damaged during the renovation process. These works also suggest the absence of tenants for the entire period of the repair. In order to carry out repairs efficiently and in a short time, it is necessary to draw up a plan of action, determine the contractor for each stage and select building materials.

How to start an apartment renovation without finishing?

To understand how to start repairs in the apartment without finishing, you should know what it is. This is a bare space in the new building, designed for free planning. The bearing monolithic or brick walls are not plastered, the floor is not screed, the ceiling is not finished. Here is the input of electricity into the apartment with the installation of the shield. Indoor heating system is installed with possible installation of radiators. Hot and cold water supply and drainage is carried out on the risers with the branches provided for future wiring. The apartment has an entrance door and plastic windows.

The order of repair in an apartment without finishing is determined by its condition. First, all the preparatory work is done, after which the finishing stage of the premises begins. The preparatory stage of the apartment renovation for final finishing consists of the following actions:

  • drawing up an apartment design project;
  • dismantling and installation of enclosing structures inside the apartment;
An apartment without finishing is a bare space, designed for free planning, which can be a tangible advantage if you need to equip a studio apartment

An apartment without finishing is a bare space, designed for free planning, which can be a tangible advantage if you need to equip a studio apartment

  • replacement of windows and front door;
  • expansion or reduction of doorways;
  • preparation of holes in the walls for laying utilities;
  • installation of electrical wiring, water supply networks, drainage and ventilation;
  • alignment of elements of the room;
  • floor screed.

The final stage of apartment repair with your own hands represents the following sequence of actions:

  • facing of walls, ceiling and floor with finishing materials;
  • installation of interior doors;
  • installation of platbands and plinths;
  • installation of switches and sockets;
  • installation of lighting elements.
The best solution for visualizing the future of the interior is a design project that was worked out independently or with the help of a specialist.

The best solution for visualizing the future of the interior is a design project that was worked out independently or with the help of a specialist.

How to start an apartment renovation with a rough finish?

Before you develop an action plan, you should know what is a rough finish apartment. Repair of such premises will be less expensive since the necessary minimum of finishing works have already been made here. Namely:

  • the screed is made;
  • the walls and the ceiling are even plastered with the base layer;
  • wiring is mounted;
  • installed front door and windows;
  • wiring engineering communications with taps for the installation of sanitary devices.

Such a minimum of finishing works somewhat simplifies the implementation of further repairs. It is much easier to change the location of some outlets and switches, than to separate the wiring from scratch. The screed floor and rough plaster walls may not be sufficiently high quality and perfectly smooth, but this is a good start for finishing, which will save on materials.

The apartment with a rough finish does not require alignment of the walls and floor, as well as communications

The apartment with a rough finish does not require alignment of the walls and floor, as well as communications

Draft repair is characteristic not only for an apartment in a new building. It is with such a rough finish that the owners of the secondary housing will have to face after the dismantling works of the old finishing coating and plumbing. And the repair sequence will depend not only on the condition of the elements of the room and engineering communications, but also on the new design of the room.

How to start repairs in the apartment: the creation of a design project

Before you decide in what sequence to make repairs in the apartment, you should choose the style of the interior, based on which to develop a design project of the premises. The choice of building materials and the progress of the repair will depend on the design of the premises.

Today there is an opportunity to create an individual and unique design in our own apartment through the use of various finishing materials and the latest modern technologies. The design project can be developed independently, on the basis of which it is possible to do repair further. To do this, it is necessary on a piece of paper to put the plan of the apartment with the arrangement of all sizes of rooms. The plan can be applied manually or use a computer program. In the first case, you should make several copies, also depict each room separately.

The design project of the apartment helps not only to determine the arrangement of furniture, color solutions and wall decoration, but also allows you to properly position sockets, taps and light sources

The design project of the apartment helps not only to determine the arrangement of furniture, color solutions and wall decoration, but also allows you to properly position sockets, taps and light sources

On one of the plans is the placement of furniture and household appliances. This will help determine the location of switches and sockets, which is necessary for future wiring, which can be displayed on a separate drawing. On each of the plans, you can specify the number of the stage, which will help you correctly plan the work, observing the strict sequence of activities. This will not only reduce repair time, but also save money.

Helpful advice! The design project is better to perform in color, which will visually see the correctness of the decorative elements of the room selected by the color and its combination with the shades of furniture.

Before you make repairs in the apartment, you should calculate the amount of building materials on the basis of the work plan. After all, an approximate calculation may entail a shortage of products that will have to buy more. And then the likelihood of choosing finishing material from another batch increases, the color of which may differ significantly from the previously purchased one.

You can entrust the development of a design project to a professional who will help you choose the most suitable option based on personal preferences and visions of the owners of the future premises.

Design project of each room can be ordered from a specialist or work independently.

Design project of each room can be ordered from a specialist or work independently.

Redevelopment of premises

To know how to start an apartment renovation with your own hands, you need to decide on the layout of the premises. If the repair of secondary housing is not provided for redevelopment of rooms, at this stage, you can plan the expansion or reduction of doorways. Therefore, before making repairs in a room or apartment without redevelopment, it is necessary to free all free space from appliances and furniture in order to exclude the possibility of its damage. And only then you can start repair work.

If the project provides for the dismantling and erection of interior partitions, the creation of new openings and niches in the walls, a change in the location of engineering communications, then permission may be needed to perform certain works on the basis of current legislation. This is especially true when it is decided how to start renovating a new apartment.

The list of works for which you need to get permission:

  • assembly or dismantling that affect the bearing walls of the premises;
  • expansion, combination or transfer of a bathroom and a bathroom;
  • work related to the heating of the loggia or balcony from the general house system;
  • all activities that affect the centralized gas supply.
An example of redevelopment of the apartment, depending on the number of people living in the house

An example of redevelopment of the apartment, depending on the number of people living in the house

There are works that must be notified to the relevant authorities:

  • the device or seal of doorways or other niches in non-load-bearing wall structures;
  • the movement of sanitary appliances in the existing dimensions of the kitchen, bathroom and bathroom;
  • dismantling and installation of non-bearing partitions without a significant change in the load on the floor slabs.

Absolutely legitimate and without notifying the relevant executive bodies you can perform the following work:

  • renovation of the apartment;
  • changing the location of electric cookers within the kitchen;
  • work related to the installation of air conditioners, antennas and protective nets on the facades of the building;
  • changing the appearance of exterior structures: balconies and loggias;
  • dismantling and installation of new utilities and equipment, similar to the previous parameters and technical device.

Related article:

Apartment redevelopment: what can and cannot be done independently

How to legitimize the already made redevelopment apartment. How to get permission to redevelop your own housing.

The choice of interior design

How to start repairing a room or apartment in general? With the choice of style of decoration of the room. Properly selected interior design will help create a comfortable and stylish accommodation. His choice depends on the taste, character and view of the life of the landlord. Today there is a variety of interior styles with distinctive features that should be studied before making repairs to be able to successfully implement the chosen direction in life.

An important point when choosing an interior is the right combination of colors and a touch of finish, furniture and decor.

An important point when choosing an interior is the right combination of colors and a touch of finish, furniture and decor.

All existing style directions designers divide into certain groups:

  • classic, which includes Provence, Empire, Baroque, English and antique style;
  • ethnic style encompasses Japanese, Egyptian, African, Scandinavian, and Chinese;
  • The modern style unites country, modern, classicism and minimalism.

The most popular is the classic interior design. Characteristic features of the direction is considered pomp, grandeur, functionality, causing aristocracy and noble grace. All elements of the interior indicate the high status of the apartment owners.

The premises are made in restrained pastel colors. The business card is a massive expensive furniture with carved patterns handmade. On the ceiling stands an unusual scenic stucco . In the classic style are often issued large apartments in which you can not save on free space.

The choice of style and color design of the interior should depend on the temperament and preferences of the owners.

The choice of style and color design of the interior should depend on the temperament and preferences of the owners.

Modern youth prefers to decorate the room in a modern style. This is especially justified for apartments with a small area. Everything should be simple, discreet and concise. In the premises there is a minimal amount of furniture, which should be compact, mobile, functional and modern. It is possible to dilute the calm palette of interior decoration with the help of bright decorative elements.

The ethnic direction reflects the predisposition of the host to a particular culture, the main features of which are embodied in interior design. With the help of modern technologies and finishing materials, you can make your dreams come true and create an imitation of your favorite country in your apartment. This area is chosen by non-standard thinking people with a great love of adventure and travel. More visually to consider each style can be on the photo of apartments with repair.

How to start an apartment renovation: the main strategy

After the design project of the apartment has been developed and the question has been solved in what sequence to do the repairs, you can proceed to the execution of works that consist of the following stages:

  • preparatory stage;
  • rough work;
  • finishing the room.
The repair process consists of three stages, following which it is possible to produce all the necessary work qualitatively and quickly.

The repair process consists of three stages, following which it is possible to produce all the necessary work qualitatively and quickly.

How to start repairs in the apartment with your own hands? From the preparatory stage, which is the implementation of a complex of dismantling works. This applies to the new building and the old apartment. Despite the fact that repairs are planned, cosmetic or capital, all surfaces must be cleaned from the old finish. At this time, the dismantling of the window blocks with the subsequent installation of higher-quality products. The front door also needs replacing. Here you may need to expand or reduce the doorway. On the basis of the project, dismantling and erection of partitions, embedment or installation of doorways for the installation of interior doors or creating arches are carried out.

Helpful advice! Repair the room with your own hands should begin with the dismantling of interior doors.

Surface preparation is one of the most important stages of do-it-yourself repair. How to start the process depends on the state of the base. This stage includes cleaning the walls, ceiling and floor from the old coating and eliminating all the flaws on the surface of the structures with the help of building materials. It is on the quality of the work performed at this stage that it will depend on how firmly and gently the new finishing covering will be.

The preparatory stage consists of dismantling the old window or door structures, removing the old finish from the walls and the floor, and embedding irregularities.

The preparatory stage consists of dismantling the old window or door structures, removing the old finish from the walls and the floor, and embedding irregularities.

First of all, the ceiling is cleaned of the old coating. Whitewash is washed off with a brush dipped in water. Old putty is removed using a grinder with an iron brush.

You can remove the usual wallpaper from the walls with a spatula, after moistening them with water. Vinyl wallpaper is quite resistant to moisture, so you can remove them using a steam generator or ironing. If there is no such device, you can use a regular iron with a steam function, which is brought to the wall at a distance of 10-15 cm. Under the influence of steam, wallpapers easily move away from the wall. You can remove the paint using a sander with a special nozzle or a building dryer. Next you need to remove the old flooring.

Helpful advice! If the project provides for the installation of suspended or suspended ceiling, the old coating can not be removed. It is enough to treat all problem areas with a strengthening primer and antiseptic.

Regardless of the choice of materials for finishing walls, the surface must be leveled and primed

Regardless of the choice of materials for finishing walls, the surface must be leveled and primed

How to start an apartment renovation with a rough finish in a new building

How to start finishing the apartment depends on the state of its structural elements. Typically, the developer performs the necessary minimum work, strictly not adhering to the technology of their implementation and without the use of high-quality building materials. Therefore, all elements of the room need a rough rough finish of the apartment with their own hands or with the help of specialists, which consists in the implementation of such activities:

  • dismantling of old and construction of new curtain structures based on the new layout;
  • window replacement;
  • preparation of holes in the walls for laying new engineering communications according to the developed scheme;
  • electrical wiring;
  • installation of technological communications: water supply, drainage, heating, ventilation, interconnecting air-conditioner;
  • alignment of all concrete surfaces;
  • installation of insulation and sound insulation;
  • floor screed.
When an apartment is overhauled, replacement of window structures

When an apartment is overhauled, replacement of window structures

After the rough repair work in the apartment is finished finishing the premises. The decision on how to plan a repair at the final stage will depend on the type of finishing material and the method of its installation. For example, if walls and ceilings are painted with paint or pasted over with wallpaper, then the finishing works begin from the ceiling, then the walls are covered and the flooring is laid. In the case of suspended ceiling installation work is performed after finishing the walls.

If the parquet is mounted, the works are carried out before the walls and ceiling decoration, in order not to damage the surface. Doors can be mounted both before and after wall finishing. If there is no platband, then the installation of the door leaf is carried out before the finishing finish, in order to be able to seal the joint between the wall and the door frame. In the case of the casing, the gap is filled with foam, and the casing is fixed to the wall after finishing the walls.

After completing all the finishing work, they start assembling baseboards, sockets, switches, trims, lighting and plumbing fixtures. Then there is a general cleaning, after which you can proceed to the placement of furniture and decorative elements. It is in this sequence is carried out repairs on their own.

The process of making floor screed self-leveling mixture

The process of making floor screed self-leveling mixture

How to start repairs in a rough apartment: installation work

The list of installation work when performing repair from scratch includes:

  • construction of non-bearing partitions;
  • replacement of windows and doors;
  • work related to the wiring and other communications.

The construction of non-bearing interior partitions is carried out on the basis of a previously developed plan. For the installation of structures can be used gas, foam concrete blocks, brick or metal frame with plasterboard finish.

Concrete blocks create a solid structure that can withstand a significant cantilever load. Therefore, this is the most suitable option if the TV will hang on the wall or a wall cabinet. The surface needs basic plaster for further decorative finishing.

Before the start of the finishing work it is necessary to make a layout for all communications.

Before the start of the finishing work it is necessary to make a layout for all communications.

Much less often partitions build from a construction brick. This results from the fact that the design occupies a significant part of free space. After all, in order for it to be stable, the thickness of the partition must be at least 170 mm. In addition, this design creates a significant load on the base.

The most popular option is to create a partition from a metal frame, which is sheathed with plasterboard. The design has good sound insulation and does not create a significant load on the supporting element of the building.

Helpful advice! In plasterboard partitions should provide for the installation of embedded parts that will withstand the load of possible mounted structures .

Installation of windows and doors should be entrusted to specialized organizations, the quality of work which will depend on the nature of the protection of the apartment from the cold and the likelihood of intruders.

Shtroblenie walls for the wiring is carried out before the start of finishing works

Shtroblenie walls for the wiring is carried out before the start of finishing works

Features of mounting communications

How to start repairing your own hands after redevelopment of the apartment? With the implementation of electrical wiring and laying of other engineering communications. First you need to do all the plumbing work. New radiators are being installed, and pipelines are being connected to the general heating system of the house. Piping for connecting faucets, toilet, washing machine, sink, bathtub, shower, water heater and dishwasher. Before installation, you should clearly know the location and connection features of all devices.

Pipes of hot and cold water can be hidden in the niches of the wall or mounted in plasterboard or plastic boxes. As a material for pipes, it is recommended to use polypropylene, which has high strength and performance characteristics.

Helpful advice! The size of the holes for the laying of sanitary communications should be two times larger than the diameter of the pipelines, which is associated with a high value of the coefficient of thermal expansion of the material.

For the quality of the plumbing system in the draft apartment, it is better to invite a specialist

For the quality of the plumbing system in the draft apartment, it is better to invite a specialist

Wiring is usually hidden. All cables and wires are laid in the wall slots, above the suspended or suspended ceiling, or in the floor under the screed.

Important! When performing repair of panel flats, wall chipping for future electrical wiring is performed only vertically. Horizontal areas are mounted at the junction of the wall and the floor or under the ceiling.

The work must begin with a markup, which is performed on the basis of the developed apartment plan. By this markup, the wall is broken down. The size of the holes is determined by the number and thickness of the laid cables. In new buildings all wiring is mounted from scratch, starting from the electrical panel. In the old apartments during the overhaul, you can also completely change the electrical cable, or install some of its parts necessary for connecting electrical appliances on the basis of a new design project.

At this stage it is necessary to provide for the laying of cables for intercom, TV, telephone and the Internet, which can also be hidden.

Before you start wiring around the apartment, you must create a wiring diagram for sockets and switches

Before you start wiring around the apartment, you must create a wiring diagram for sockets and switches

What begins in the repair of the apartment ceiling?

How to start repairing a rough apartment? All repairs in the apartment are usually done from the top down. So you need to start from the ceiling. In new buildings, it is presented in the form of a monolithic concrete slab, the surface of which must be cleaned, plastered, primed and revetted with decorative trim. If the repair is performed in an old apartment, then at the first stage, the surface should be cleaned of the old finishing material.

Further action plan depends on the choice of design ceiling. If the surface is perfectly smooth, then the simplest and cheapest option is its whitewashing or painting. If the base requires a preliminary elimination of defects using plastering, then this option will be very time consuming and costly.

Another budget, but not so time consuming option is the installation of ceiling tiles, which can even perform a beginner. The surface of the base does not need pre-alignment. The main thing is to choose high-quality finishing material and glue.

Painting work is better to start from the ceiling

Painting work is better to start from the ceiling

A more acceptable, but expensive solution is to create a hinged plasterboard structure, which can be of any shape and have several levels, which determines the cost and time of work. With this solution, you can get a free space between the ceiling and the structure for wiring and installation of spotlights.

A modern solution today is the creation of a stretch ceiling made of PVC canvas. The result is a perfectly even base of any texture and shade. Installation is done in a matter of hours by a specialized team. Before performing work, you must first prepare the wall structures. Because the process of installing the stretch ceiling involves the execution of the edging of baguettes. In addition, it is necessary to finish all dirty work in the room so that dust and possible pollution will not settle on a clean ceiling.

Finishing wall structures

Alignment of the walls is an important event, the quality of which depends on the durability and aesthetic appearance of the future decorative finish. Usually, when performing an apartment renovation with a rough finish, they encounter fairly flat concrete walls, which only need to be easily adjusted with the help of plaster mixes. However, if the walls are made of expanded clay blocks, gas silicate or brick, rather time-consuming and costly work associated with their alignment is required.

Smooth white walls allow you to embody any design decisions, so this stage of repair should be given special attention

Smooth white walls allow you to embody any design decisions, so this stage of repair should be given special attention

Before you begin leveling the walls, you must thoroughly clean the surface from the old coating. This is a mandatory step for the overhaul of old apartments. Any cracks or other defects found must be sealed. To do this, the problem areas need to be embroidered, primed and sealed with cement mortar, putty or sealant. Wide gaps and cracks in the corners can be filled with foam.

Alignment of the walls can be done in two ways:

  • plastering walls with building mixtures;
  • wall decoration GKL and GVL sheets.

The first option involves the use of plaster mixes on a plaster or cement base. If the wall has minor irregularities, visual alignment is performed using a building level. If the surface has a significant difference, then the alignment is advisable to perform on the beacons. This is especially important when the walls are painted. When installing furniture along a flat wall eliminates the possibility of cracks.

For plaster walls and ceilings, use quality materials with anti-fungal properties.

For plaster walls and ceilings, use quality materials with anti-fungal properties.

In conjunction with the alignment of wall surfaces should finish the door and window openings. For this you can use plaster, drywall or plastic panels.

The second option is preferable when the walls are made of brick or have significant irregularities. The use of plaster is unnecessarily costly and time-consuming event. GCR sheets or GVK are mounted on a previously installed metal frame. As a result of this finish, a gap is formed between the wall and the lining, in which various communications can be hidden. This process is characterized by the absence of dirty work and low labor input. Walls do not need further plastering before finishing with decorative material.

The main disadvantage of this design is its fragility. Therefore, if the surface will subsequently be mounted furniture or appliances, you should take care of embedded parts that are mounted before making the leveling layer.

Wall paint should be selected based on the functional purpose of the room.

Wall paint should be selected based on the functional purpose of the room.

How does floor repair begin?

Repair of the floor in the apartment begins with the execution of the screed, which is used to eliminate significant damage and unevenness of the base relative to the horizon. This is due to backfilling or filling the floor with a special compound that forms a perfectly flat surface necessary for the further installation of the floor covering. In addition, the screed serves to strengthen the surface of the concrete slab and increase its strength characteristics. Before its implementation it is necessary to create a sound and heat insulation layer. For this, claydite is often used, which is laid at a thickness of at least 5 cm. Due to the leveling layer, you can raise the floor level or perform a technological slope.

Helpful advice! In the bathroom, it is advisable to set a certain slope of the floor for the flow of water in the event of a flood, which will prevent flooding of the whole apartment.

Floor screed can be:

  • concrete;
  • cement and sand;
  • self-leveling;
  • dry;
  • semi-dry.
Laying of the underfloor heating system is performed before the draft of the draft

Laying of the underfloor heating system is performed before the draft of the draft

The traditional way to adjust the surface of the floor is the use of concrete or cement-sand mortars, which are appropriate to apply to eliminate significant irregularities and surface damage. They are used in the installation of heat and sound insulation.

The most practical and modern solution is the use of self-leveling compounds consisting of two options for the mixture: rover and leveling. The first is used to eliminate significant unevenness of the base, the second is the finishing layer, creating a smooth and smooth surface without defects.

However, despite the less labor-intensive process when using these compounds, their cost significantly exceeds the traditional mixtures. Therefore, self-leveling compositions should be used when the height difference relative to the horizon does not exceed 4 cm.

The semi-dry or dry variant is used to level the base, when the height difference reaches more than 3-5 cm. This is a good alternative to traditional compositions, however, the new layer will create much less pressure on the concrete slab. Therefore, this method is recommended when performing repair of apartments in old and houses under the laying of carpet and laminate.

Draft floor screed is the basis for quality coverage and is carried out in several stages

Draft floor screed is the basis for quality coverage and is carried out in several stages

The procedure for performing floor screed

First you need to prepare the base floor. To do this, open the old floor design with dismantling baseboards, flooring and old screed. Further, the surface is cleaned from debris and dust. In case of detection of cracks, gouges and chips, it is necessary to carry out repair work when using seals. To eliminate deep damage, a splitting method is used, which consists in performing cuts perpendicular to the crack with a depth of 20 mm and a thickness of 5 mm. Further, all damage must be sealed with concrete.

The alignment of the floor begins with its marking, namely, the definition of the lowest and highest point relative to the horizon. The walls indicate the level, which indicates the thickness of the future layer of fill. Based on the markup, beacons and guides are installed. Pouring the mixture starts from the far corner of the room. The solution is distributed and leveled using a metallic rule.

Concrete screed should dry out for three weeks. After 24-30 hours after completion of work, it is necessary to wet the surface once a day.

For uniform distribution of the screed and removal of air bubbles, a special needle roller is used.

For uniform distribution of the screed and removal of air bubbles, a special needle roller is used.

Helpful advice! In order to obtain a solid and high-quality foundation, it is not recommended to disturb the natural process of moisture evaporation by means of heating devices and airing the room.

In a similar way, the floor surface is leveled with a semi-dry mortar, which is evenly distributed and compacted using a conventional spade. After complete drying, the surface must be treated with wooden grout. The process is performed until the surface of the floor is perfectly level.

Dry screed involves laying a layer of expanded clay with a fraction of 1-5 mm, on top of which gypsum-fiber plates are mounted. They are interconnected by means of self-tapping screws with special glue coating the end edges. This is the easiest way to level the floor, which allows you to get a coating of increased strength. After the floor screed is completed, you can proceed to the installation of the selected floor covering.

Laying the flooring is done only when the final floor screed is completely dry.

Laying the flooring is done only when the final floor screed is completely dry.

Repair apartment turnkey. Price per square meter

Regardless of what kind of renovation is planned in the apartment, you can make it yourself or use the services of professionals. You can also attract specialists to perform specific types or stages of work in the entire apartment or in a particular room.

The cost of redecoration includes the following list of works:

  • dismantling of old decoration from the elements of the room;
  • painting or whitewashing the ceiling;
  • partial alignment of the walls;
  • sticking non-woven or paper wallpaper;
  • laying flooring;
  • partial replacement of electricians and plumbing;
  • laying tiles.

The cost of such a list of works starts from 2500 rubles / m², which depends on the complexity of the process. Repair of a one-room apartment will cost 85 thousand rubles, a two-room apartment – 110 thousand rubles, a three- room apartment – 120 thousand rubles. This is all without the cost of materials.

Turnkey apartment renovation includes all stages - from design to removal of construction waste.

Turnkey apartment renovation includes all stages – from design to removal of construction waste.

If it is necessary to perform rough work, which includes the installation and dismantling of wall structures, the alignment of all elements of the room and electrical work, the price of services is an average of 3,500-4,000 rubles / m².

When it is necessary to perform all turnkey electrical work in a new building, the price of the work for a one-room apartment is 25 thousand rubles, a two-room apartment is 35 thousand rubles, a three-room apartment is 45 thousand rubles.

The cost of a turnkey overhaul is an average of 5500 rubles / m². It all depends on the condition of the apartment and the total area of ​​the room. Many experts offer to perform the repair of premium class, which includes the development of an individual design project. The price of this repair is about 7,500 rubles / m².

With the help of the designer, you can make repairs in the apartment under the individual needs of the customer.

With the help of the designer, you can make repairs in the apartment under the individual needs of the customer.

The price of turnkey apartment renovation with materials

The cost of repairs with regard to materials depends on many factors: the area of ​​the apartment, its current state (new or secondary housing), the volume and complexity of the work stages and the quality of the building materials used. You can approximately calculate the cost of repair using an online calculator, which is located on specialized sites. It takes into account the average cost of repairing an apartment per square meter. More accurate information can be obtained only after the preparation of estimates in each case.

Thus, the cost of a budget apartment renovation in a new building with materials will cost an average of 6-6,5 thousand rubles / m². If more expensive building materials are used to repair the apartment, the price of the work will be about 11-12 thousand rubles / m². Those who want to decorate their homes with exclusive finishing products should prepare at least 20 thousand rubles / m². The price of repair of secondary housing will be 10-15% lower, which is determined by the condition of the apartment.

Also, the cost of repairs with materials affects the functional purpose of the room. So, the repair of a living room will cost 6,000 rubles / m², the corridor – 6,500 rubles / m², kitchens – 8,500 rubles / m², a bathroom – 8,000 rubles / m², a loggia or balcony – 5,000 rubles / m².

Repair in an apartment is a difficult and costly process, but if you approach the issue correctly, having planned all the works and choosing the most suitable materials, the result will please the owner for a long period of time.

Repair in an apartment is a difficult and costly process, but if you approach the issue correctly, having planned all the works and choosing the most suitable materials, the result will please the owner for a long period of time.

When deciding how to start repairs in a house or apartment, it is necessary to examine each process in detail. Especially when it comes to doing your own hands. If you are not confident in your own capabilities, it is better to entrust the performance of all the work or a specific stage to professionals who will offer a clear plan for repairing the apartment. As a result, the work will be performed efficiently and in a short time.